Skip to content
Pinnacle Global General Contracting

SERVICE 06 / 07

Washrooms made to be lived in.

Layouts, waterproofing, tile and fixtures planned for daily use and long-term durability — and built by one accountable team.

Finished washroom with vanity, tile and natural light

OVERVIEW

A washroom has to handle water, steam and daily use — and still feel calm.

A great washroom is built properly behind the tile: sound waterproofing, good ventilation and well-planned plumbing, finished with fixtures and surfaces that are easy to live with.

We plan each washroom around your space, your routines and your budget, then coordinate everything from demolition and rough-ins to tile, fixtures and final finishes.

SCOPE OF WORK

Update, or full renovation?

Both can transform a washroom. The right choice depends on your layout, the condition behind the walls and how much you want to change.

WHAT IT ISWASHROOM UPDATEReplacing fixtures, surfaces and finishes within the existing layout.FULL RENOVATIONTaking the room back to the studs and rebuilding layout, systems and finishes.
LAYOUTWASHROOM UPDATEToilet, shower and vanity generally stay where they are.FULL RENOVATIONFixtures can be moved — for example, a tub replaced with a walk-in shower.
TYPICAL WORKWASHROOM UPDATEVanity, toilet, faucets, lighting, mirrors and paint.FULL RENOVATIONDemolition, plumbing, waterproofing, tile, ventilation, fixtures and finishes.
BEST FORWASHROOM UPDATEWashrooms in good condition that feel dated.FULL RENOVATIONWashrooms with layout issues, water damage or ageing systems.
Washroom tile work and shower niche detail
DETAIL · PROJECT / LOCATION

WHAT WE HANDLE

What goes into a well-built washroom.

  1. 01

    Layout & design planning

    We plan fixtures, storage and circulation so the room works for daily routines.
  2. 02

    Demolition & preparation

    Careful removal and protection of the rest of your home during the work.
  3. 03

    Plumbing & ventilation

    Supply, drains and exhaust updated to suit the new layout and prevent moisture problems.
  4. 04

    Waterproofing

    Proper membranes and detailing behind showers and tubs — the part that protects your home.
  5. 05

    Tile & surfaces

    Floor and wall tile laid level, aligned and finished cleanly.
  6. 06

    Fixtures, vanity & finishes

    Installation of vanities, fixtures, lighting and accessories that complete the room.

HOW IT WORKS

From first plan to finished tile.

  1. STEP 01

    Consultation

    Tell us how you use the washroom and what isn't working today.

  2. STEP 02

    Planning

    We define layout, scope, selections and a clear construction approach.

  3. STEP 03

    Build

    Our team moves the project from plan to reality, keeping you informed.

  4. STEP 04

    Completion

    We hand over the finished washroom with attention to every detail.

WASHROOM PROJECTS

VIEW ALL PROJECTS
Renovated washroom, full room view
PROJECT TITLE · LOCATION
Walk-in shower and vanity in a renovated washroom
PROJECT TITLE · LOCATION
Washroom renovation detail
PROJECT TITLE · LOCATION

QUESTIONS

Common washroom questions

Have one we haven't answered? Ask us directly.

It depends on the scope. Replacing fixtures in place often doesn't, while moving plumbing or adding a new washroom usually does. We confirm requirements during planning.

Completed washroom renovation in soft light

Ready for a better washroom?

Tell us about your home and how you'd like to use the space. We'll help you plan the right washroom.